| Some
seven years earlier Ag & Turf had installed an intensive lateral system. The club had decided that the system, although working, would benefit from a slit-drain, sand carpet system (photos A & B). |
|
| The
slit drains were installed at one metre centres to a total of approximately
50,000 metres. Trenching and backfilling took 13 days with one day lost to rain (photo C). |
|
| The
first sand application was 10mm, a total of 500 cubic metres was spread
(photos D & E). The second sand application was six months later, at 5mm. |
|