project in Fiji was 40km north of Lautoka in a small town called BA. Field construction was cut and filled with subgrade clay and rocks. Two fields were built - one soil and one slit-drain sand field (photos A & B). |
|
| We
cut the laterals and irrigation lines with a rock saw, then cut the slits
with a heavy-duty slit wheel due to the rock content (photos C &
D). Backfill materials were screened to a high standard which made for the easiest backfilling of all our overseas projects (photo E). |
|