Fields were constructed on a Water Catchment area, that floods when it rains.
The area had to be raised some 500mm. The main field was drained, laterals
into the Coral, then slit drains at 90% to laterals and then 50mm of top
dressing sand. The number 2 field remains a soil field. Removing Top Soil before filling with coral (photos A & B). Levelling the fields after being raised (photos C & D). |
|
| Final level, field ready to trench laterals (photos E & F). Trenching lateral drains directly into coral base (photo G). After Trenching you can see ground water entering laterals (photo H). | |
| Field after lateral installation has been completed (photo I). After lateral installation slit drains are trenched at 90% to laterals (photo J). Trenching and backfilling slit drains (photos K & L). | |
| Laser levelling topdressing sand at 50mm depth (photos M & N). | |
| After final level, couch seed is spread and the area is Cambridge rolled and drag matted (photos O & P). Completed project, sown, with irrigation running (photo Q). | |